Industrial Engineering and Production Management Pick up the incorrect statement from the following. A critical ratio scheduling Determines the status of each activity Adjusts automatically changes in activity progress Establishes the relative priorities among various activities on a common basis All of the these Determines the status of each activity Adjusts automatically changes in activity progress Establishes the relative priorities among various activities on a common basis All of the these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by 2AP/C √(2AP/C) (AP/C)² AP/C 2AP/C √(2AP/C) (AP/C)² AP/C ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The deductions for, employees provident fund start After 100 days of joining the service After 240 days of joining the service Immediately on joining the service After 60 days of joining the service After 100 days of joining the service After 240 days of joining the service Immediately on joining the service After 60 days of joining the service ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The process layout is best suited where Few number of non-standardized units is to be produced Mass production is envisaged Machines are arranged according to sequence of operation Specialization exists Few number of non-standardized units is to be produced Mass production is envisaged Machines are arranged according to sequence of operation Specialization exists ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches 0.5 0.75 0.8 0.6667 0.5 0.75 0.8 0.6667 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management An optimum project schedule implies To produce best results under given constraints Optimum utilization of men, machines and materials Timely execution of project Lowest possible cost and shortest possible time for project To produce best results under given constraints Optimum utilization of men, machines and materials Timely execution of project Lowest possible cost and shortest possible time for project ANSWER DOWNLOAD EXAMIANS APP