Building Materials Pick up the correct statement from the following: Method of sawing timber Cut out of quarter logs, parallel to the medullary rays and perpendicular to annual rings, is known as radial sawing Tangentially to annual rings, is known as tangential method All of these In four quarters such that each board cuts annual rings at angles not less than 45°, is known as quarter sawing method Cut out of quarter logs, parallel to the medullary rays and perpendicular to annual rings, is known as radial sawing Tangentially to annual rings, is known as tangential method All of these In four quarters such that each board cuts annual rings at angles not less than 45°, is known as quarter sawing method ANSWER DOWNLOAD EXAMIANS APP
Building Materials The initial setting time for ordinary Portland cement as per IS specifications should not be less than 10 minutes 60 minutes 30 minutes 600 minutes 10 minutes 60 minutes 30 minutes 600 minutes ANSWER DOWNLOAD EXAMIANS APP
Building Materials For the manufacture of plywood, veneers are placed so that grains of adjacent veneers Inclined at 60° Inclined at 45° Run at right angles Parallel Inclined at 60° Inclined at 45° Run at right angles Parallel ANSWER DOWNLOAD EXAMIANS APP
Building Materials Strength of cement concrete primarily depends upon Water-cement ratio Quantity of aggregate Quality of water Quantity of cement Water-cement ratio Quantity of aggregate Quality of water Quantity of cement ANSWER DOWNLOAD EXAMIANS APP
Building Materials Which of the following timbers is suitable for making sports goods? Deodar Sal Mulberry Mahogany Deodar Sal Mulberry Mahogany ANSWER DOWNLOAD EXAMIANS APP
Building Materials Specific gravity for most of the building stones lies between 3.0 to 3.5 2.0 to 2.5 1.5 to 2.0 2.5 to 3.0 3.0 to 3.5 2.0 to 2.5 1.5 to 2.0 2.5 to 3.0 ANSWER DOWNLOAD EXAMIANS APP