Engineering Drawing Once a drawing is determined to be complete, the title block is used to document the change from: An assembly to a finished drawing A finished to a working drawing A working drawing to a draft A draft to a finished drawing An assembly to a finished drawing A finished to a working drawing A working drawing to a draft A draft to a finished drawing ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing The foundation contractor will work with the following architectural plans. Floor plan Site plan All of these Foundation Floor plan Site plan All of these Foundation ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Students can complete an associate's degree in drafting which normally takes about __________ years to complete. Two Three Four One Two Three Four One ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing The architectural and construction industries use the United States National CAD standard (NCS) system on many ________ projects. Aerospace Publicly funded Commercial Residential Aerospace Publicly funded Commercial Residential ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing The typical parts list should include the _________. Part number Manufacturing material Number of parts needed All of these Part number Manufacturing material Number of parts needed All of these ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing There should be a visible gap between the wall and the _________ line. Dimension Center Extension Leader Dimension Center Extension Leader ANSWER DOWNLOAD EXAMIANS APP