Process Equipment and Plant Design Normal screwed fittings are used for pipes upto a diameter of __________ inches. 7 1.5 5 3 7 1.5 5 3 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The ratio of down take area to cross-sectional area of the tube, for calendria type evaporator ranges from 1.5 to 2 2 to 2.5 1 to 1.5 0.5 to 1 1.5 to 2 2 to 2.5 1 to 1.5 0.5 to 1 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For high pressure process equipments/vessels, the connected nozzle should be Flanged Brazed Screwed Welded Flanged Brazed Screwed Welded ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Liquid/petroleum fuel storage tanks are built underground (as in case of petrol pumps), when the storage capacity is less than __________ kilolitres. 30 45 20 85 30 45 20 85 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design An increase in the liquid resistance to interphase mass transfer and a resultant reduction in plate efficiency is caused by Decrease in gas solubility for absorbers An increase in relatived volatility for rectification columns All of these An increase in liquid viscosity Decrease in gas solubility for absorbers An increase in relatived volatility for rectification columns All of these An increase in liquid viscosity ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Log mean temperature difference in case of multi-pass shell and tube heat exchanger is always Both B & C More than geometric mean value More than arithmetic mean value Less than arithmetic mean value Both B & C More than geometric mean value More than arithmetic mean value Less than arithmetic mean value ANSWER DOWNLOAD EXAMIANS APP