Nuclear Power Engineering Moderating material used in a thermal-reactor should be a Poor absorber of neutrons Solid substance Good absorber of neutrons None of these Poor absorber of neutrons Solid substance Good absorber of neutrons None of these ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering The time taken for a radioactive element to reduce to 50% of its original weight is __________ years, if its half life period is 12 years. 24 18 36 6 24 18 36 6 ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering Fuel for a fast breeder reactor is Plutonium Neptunium Uranium Radium Plutonium Neptunium Uranium Radium ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering Gas cooling as compared to water cooling of nuclear reactors Can not attain a high temperature None of these Is more efficient as gas has a higher specific heat Can produce only saturated steam for feeding to power turbine Can not attain a high temperature None of these Is more efficient as gas has a higher specific heat Can produce only saturated steam for feeding to power turbine ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering Thorium can be converted into U-233 in a __________ reactor. Swimming pool Fast breeder Thermal Liquid metal cooled Swimming pool Fast breeder Thermal Liquid metal cooled ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering The critical mass of a fissionable material can be reduced by Surrounding it by neutron absorbing material Heating it Surrounding it by neutron reflecting material Cooling it Surrounding it by neutron absorbing material Heating it Surrounding it by neutron reflecting material Cooling it ANSWER DOWNLOAD EXAMIANS APP