Automation System Many things can be done to minimize downtime loss. Identify two of them. stock critical spare parts provide an extra workstation establish a user forum program both b and c None of these stock critical spare parts provide an extra workstation establish a user forum program both b and c None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System Productivity is defined as: output per man-hour of labour cost per day cost per unit number of items manufactured per day None of these output per man-hour of labour cost per day cost per unit number of items manufactured per day None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System A flip-flop: remembers what was previously stored in it None of these is a sequential logic device is a combinational logic device (a) and (c) remembers what was previously stored in it None of these is a sequential logic device is a combinational logic device (a) and (c) ANSWER DOWNLOAD EXAMIANS APP
Automation System The method of solid modeling that defines the topology of faces, edges, and vertics, as well as data that defines the surface in which each face lies is called: layering None of these boundary representation isometric constructive solid geometry layering None of these boundary representation isometric constructive solid geometry ANSWER DOWNLOAD EXAMIANS APP
Automation System Which of the following is considered a high-level language? All of these Machine language FORTRAN Assembly language None of these All of these Machine language FORTRAN Assembly language None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System What should be first considered in choosing a plotter? The hardware you currently own The cost None of these The application for which it will be used The type of data you will input The hardware you currently own The cost None of these The application for which it will be used The type of data you will input ANSWER DOWNLOAD EXAMIANS APP