Engineering Economics Keeping in view, the feasibility order of magnitude, the preliminary, conceptual or budget estimates, are prepared by: Construction manager Construction manager Owner himself/herself Architect/engineer Construction manager Construction manager Owner himself/herself Architect/engineer ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What are the common methods of computing depletion charge? Unit method and percentage method Conservative method and conventional method Rational method and irrational method Discrete method and depletion allowance method Unit method and percentage method Conservative method and conventional method Rational method and irrational method Discrete method and depletion allowance method ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics In a cash-flow diagram: Time 0 is considered to be the present All of these A vertical arrow pointing up indicates a positive cash flow Time 1 is considered to be the end of time period 1 Time 0 is considered to be the present All of these A vertical arrow pointing up indicates a positive cash flow Time 1 is considered to be the end of time period 1 ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What is the present worth of a year annuity paying P 3,000.00 at the end of each year, with interest at 8% compounded annually? P 7,590.12 P 7,420.89 P 7,731.29 P 7,654.04 P 7,590.12 P 7,420.89 P 7,731.29 P 7,654.04 ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Under ordinary simple interest, how many days in one year? 360 365 300 366 360 365 300 366 ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What is an accounting term that represents an inventory account adjustment? Overhead cost Standard cost Cost of goods sold Cost accounting Overhead cost Standard cost Cost of goods sold Cost accounting ANSWER DOWNLOAD EXAMIANS APP