Engineering Drawing It is customary for the first sheet of a working drawing set to include __________. Exploded assembly All of these A parts list Assembled assembly Exploded assembly All of these A parts list Assembled assembly ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Using the Relative Polar Coordinate System to add a 3 inch line that is 45 degrees from the end point of the line created above the drafter would ________. Type 3 forward slash and enter Type 3 and try to use the Dynamic Input readout to find the end point Type @3 Type 3 back slash and enter Type 3 forward slash and enter Type 3 and try to use the Dynamic Input readout to find the end point Type @3 Type 3 back slash and enter ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing This is used to indicate that a surface is to be machined: Machining mark Coordinate mark Finish mark Roughness indicator Machining mark Coordinate mark Finish mark Roughness indicator ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Newer versions of Auto-CAD utilize the _________ to make block library management very easy. File / search Design Center None of these File / find File / search Design Center None of these File / find ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing A secondary auxiliary view is a projection off of the __________. Primary auxiliary view Front view None of these Top view Primary auxiliary view Front view None of these Top view ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Architectural drawings used to construct a house are often plotted with a scale of ¼" = 1'-0". What scale is this? Full Half Quarter Double Full Half Quarter Double ANSWER DOWNLOAD EXAMIANS APP