Building Materials Initial setting time of cement for asbestos cement products should be not less than 30 minutes 50 minutes 75 minutes 90 minutes 30 minutes 50 minutes 75 minutes 90 minutes ANSWER DOWNLOAD EXAMIANS APP
Building Materials Bulking of sand is caused due to Viscosity Air voids Surface moisture Clay contents Viscosity Air voids Surface moisture Clay contents ANSWER DOWNLOAD EXAMIANS APP
Building Materials Apiece of sawn timber whose cross-sectional dimensions exceed 5 cm, in one direction and 20 cm in the other direction, is called a Baulk Strip Cant Deal Baulk Strip Cant Deal ANSWER DOWNLOAD EXAMIANS APP
Building Materials A ferrous metal is All of these Wrought iron Cast iron Steel All of these Wrought iron Cast iron Steel ANSWER DOWNLOAD EXAMIANS APP
Building Materials According to IS 399-1963, the weight of the timber is specified at 10% moisture content 12% moisture content 14% moisture content 8% moisture content 10% moisture content 12% moisture content 14% moisture content 8% moisture content ANSWER DOWNLOAD EXAMIANS APP
Building Materials The percentage of alumina and silica in good fire clay vary respectively is 30, 70 25, 75 All of these 35, 65 30, 70 25, 75 All of these 35, 65 ANSWER DOWNLOAD EXAMIANS APP