Industrial Engineering and Production Management PERT All of the listed here Permits management to foresee quickly the impact of variations from the plan Provides an approach for keeping planning up-to-date Provides a way for management to require that planning be done on a uniform and logical basis All of the listed here Permits management to foresee quickly the impact of variations from the plan Provides an approach for keeping planning up-to-date Provides a way for management to require that planning be done on a uniform and logical basis ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT is Limit up of event oriented diagrams All of the listed here Used for research and development projects An analytic tool in concept Limit up of event oriented diagrams All of the listed here Used for research and development projects An analytic tool in concept ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT requires Double time estimate Single time estimate Triple time estimate None of the listed here Double time estimate Single time estimate Triple time estimate None of the listed here ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The factors which are to be considered while developing a good wage incentive plan will include All of the listed here Guaranteed basic pay Ease of administration Adequate incentive All of the listed here Guaranteed basic pay Ease of administration Adequate incentive ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If ‘F’ is the fixed cost, ‘V’ is the variable cost per unit (or total variable costs) and ‘P’ is the selling price of each unit (or total sales value), then break-even point is equal to (F × V)/P (F × P)/V F/[1 - (V/P)] F/[1 + (V/P)] (F × V)/P (F × P)/V F/[1 - (V/P)] F/[1 + (V/P)] ANSWER DOWNLOAD EXAMIANS APP