Automation System In the instruction, 500 SUBA # 50 the command field is: 500 (b) and (c) SUBA # 50000 None of these 500 (b) and (c) SUBA # 50000 None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System Four basic elements are required for an automated machine tool or production process. They are: input interface, memory, output interface and: None of these software logic NC tape programming computer graphics workstation None of these software logic NC tape programming computer graphics workstation ANSWER DOWNLOAD EXAMIANS APP
Automation System CAE and CAM are linked through: parts production and testing NC tape programming and automated design a common data base and communications system assembly automation and tool production. None of these parts production and testing NC tape programming and automated design a common data base and communications system assembly automation and tool production. None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System The main function(s) of computer in CAD is/are To relieve the designer from routine repetitious tasks. To serve as an extension to the memory of the designer All of these To enhance the analytical and logical power of the designer None of these To relieve the designer from routine repetitious tasks. To serve as an extension to the memory of the designer All of these To enhance the analytical and logical power of the designer None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System What is the process lag? The time it takes for the mass of the process to respond to an input change. All of these The lag in the error signal when the setpoint is changed. None of these The time it takes for the sensor to respond to a changed. The time it takes for the mass of the process to respond to an input change. All of these The lag in the error signal when the setpoint is changed. None of these The time it takes for the sensor to respond to a changed. ANSWER DOWNLOAD EXAMIANS APP
Automation System The ideal solution is to have a system coordinator who will interface with the engineering and manufacturing managers, as well as the: finance manager MIS manager president marketing manager None of these finance manager MIS manager president marketing manager None of these ANSWER DOWNLOAD EXAMIANS APP