Industrial Engineering and Production Management In perpetual inventory control, the material is checked as it reaches its Minimum value Average value Middle value Maximum value Minimum value Average value Middle value Maximum value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Material handling in automobile industry is done by Trolley All of these Overhead crane Belt conveyor Trolley All of these Overhead crane Belt conveyor ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when(Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) There is no such criterion CAM = DAM CAM > DAM CAM < DAM There is no such criterion CAM = DAM CAM > DAM CAM < DAM ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The technique for establishing and maintaining priorities among the various jobs of any project is known as Critical ratio scheduling Short interval scheduling Slotting technique for scheduling Event flow scheduling technique Critical ratio scheduling Short interval scheduling Slotting technique for scheduling Event flow scheduling technique ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management For material transportation, conveyors are used when the prevailing conditions include All of the listed here Routes do not vary Loads are uniform Materials move relatively continuously All of the listed here Routes do not vary Loads are uniform Materials move relatively continuously ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The employees provident fund act is applicable to Volunteers All industries The industries notified by Government All industries other than small and medium industries Volunteers All industries The industries notified by Government All industries other than small and medium industries ANSWER DOWNLOAD EXAMIANS APP