Economics of Power Generation In order to improve the power factor in case of 3 phase loads, the capacitors are connected in Delta Star None of the listed here Star or delta Delta Star None of the listed here Star or delta ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The fixed cost of energy generated Depends on maximum demand Depends on units generated Indepemdent of max demand and units generated None of the listed here Depends on maximum demand Depends on units generated Indepemdent of max demand and units generated None of the listed here ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Load shedding is done to Improve power factor Repair the machine Run the equipment efficiency Reduce peak demand Improve power factor Repair the machine Run the equipment efficiency Reduce peak demand ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The drawback of diminishing value method for calculating depreciation is that depreciation charges Are small in early years Are high in later years None of the listed here Are independent of rate of interest Are small in early years Are high in later years None of the listed here Are independent of rate of interest ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Generators for peak load plants are usually designed for maximum efficiency at 25 percent overload 25 to 50 % percent full load 50 to 75 % percent full load Full load 25 percent overload 25 to 50 % percent full load 50 to 75 % percent full load Full load ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation When the power factor of generating station is improved, the cost per unit Increases Decreases None of the listed here Remains same Increases Decreases None of the listed here Remains same ANSWER DOWNLOAD EXAMIANS APP