Generation of Electrical Energy In interconnected grid system, more efficient plants are used as Both peak & base load plant None of these Peak load plant Base load plants Both peak & base load plant None of these Peak load plant Base load plants ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy India's first nuclear power plant was installed at Kota Tarapore None of these Kalpakkam Kota Tarapore None of these Kalpakkam ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy Francis, Kaplan and propeller turbines fall under the category of Impulse turbine Axial flow Reaction turbine Impulse reaction combined Impulse turbine Axial flow Reaction turbine Impulse reaction combined ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy Area under the daily load curve divided by 24 hrs gives Average load None of these Units generated Maximum demand Average load None of these Units generated Maximum demand ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy Blowing down of boiler water is the process to increase the steam temperature to control the solid concentration in the boiler water by removing some of the concentrated saline water None of these to reduce the boiler pressure to increase the steam temperature to control the solid concentration in the boiler water by removing some of the concentrated saline water None of these to reduce the boiler pressure ANSWER DOWNLOAD EXAMIANS APP
Generation of Electrical Energy For satellite the source of energy is Any of these Solar cell Battery Cryogenic storage Any of these Solar cell Battery Cryogenic storage ANSWER DOWNLOAD EXAMIANS APP