DGVCL Exam Paper (12-06-2016) In India _____ supply is 415 V supply through 4-wires. Three - phase Two-phase None of these Single - phase Three - phase Two-phase None of these Single - phase ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) In a transmission line if booster transformers are to be used, preferred location will be At the receiving end At the sending end At the intermediate point Anywhere in the line At the receiving end At the sending end At the intermediate point Anywhere in the line ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The following formula is correct: Diversity factor = 1 - Coincidence Factor Diversity factor = 1/Coincidence Factor All of these Diversity factor = 1 x Coincidence Factor Diversity factor = 1 - Coincidence Factor Diversity factor = 1/Coincidence Factor All of these Diversity factor = 1 x Coincidence Factor ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) As per Electricity Act, _____ means a process which simultaneously produces two or more forms of useful energy (including electricity). Captive Power Plant Cogeneration Power generation None of these Captive Power Plant Cogeneration Power generation None of these ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) For cost & safety, the outdoor substations are installed for voltages above: 110 kV 33 kV 60 kV 11 kV 110 kV 33 kV 60 kV 11 kV ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) DGVCL is not distributing electricity in _____ district. Vadodara Navsari Tapi Valsad Vadodara Navsari Tapi Valsad ANSWER DOWNLOAD EXAMIANS APP