Materials and Construction In drop forging process, the forging is done by dropping the __________ at high velocity. Hammer Workpiece Weight on hammer Die with hammer Hammer Workpiece Weight on hammer Die with hammer ANSWER DOWNLOAD EXAMIANS APP
Materials and Construction Hot working of lead is carried out at Room temperature 150° C 75° C 373° K Room temperature 150° C 75° C 373° K ANSWER DOWNLOAD EXAMIANS APP
Materials and Construction Visco-elastic behaviour of materials which is time dependent is common in Non-crystalline solids Crystalline solid Non-crystalline organic polymer Plastics Non-crystalline solids Crystalline solid Non-crystalline organic polymer Plastics ANSWER DOWNLOAD EXAMIANS APP
Materials and Construction Concrete tank can be used to store Ferrous sulphate Saturated brine Sulphuric acid Alum Ferrous sulphate Saturated brine Sulphuric acid Alum ANSWER DOWNLOAD EXAMIANS APP
Materials and Construction 'Semi steel' is Neither A nor B Both A & B Stronger than cast iron Produced by adding 10-20% steel to the cupola charge Neither A nor B Both A & B Stronger than cast iron Produced by adding 10-20% steel to the cupola charge ANSWER DOWNLOAD EXAMIANS APP
Materials and Construction A bearing metal should not have Low co-efficient of friction Enough plasticity Low thermal conductivity High toughness Low co-efficient of friction Enough plasticity Low thermal conductivity High toughness ANSWER DOWNLOAD EXAMIANS APP