DGVCL Exam Paper (12-06-2016) In a transmission line if booster transformers are to be used, preferred location will be At the intermediate point At the sending end At the receiving end Anywhere in the line At the intermediate point At the sending end At the receiving end Anywhere in the line ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The number of cycles in which a high speed circuit breaker can complete its operation is 40 to 50 20 to 30 3 to 8 10 to 18 40 to 50 20 to 30 3 to 8 10 to 18 ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) You should choose Sleep option when The computer is tired after working for the whole day. When computer gets hanged frequently. Let it sleep for some time. You finish working and are going to bed. You are leaving for a very short time and want to resume your work shortly. The computer is tired after working for the whole day. When computer gets hanged frequently. Let it sleep for some time. You finish working and are going to bed. You are leaving for a very short time and want to resume your work shortly. ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) Which of the following circuit breakers has high reliability & minimum maintenance? Sulphur hexafluoride CB Vacuum CB Air blast CB Bulk oil type CB Sulphur hexafluoride CB Vacuum CB Air blast CB Bulk oil type CB ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The Electricity Act is an Act of _____of India enacted to transform the power sector in India. The Parliament All of these A State resolution None of these The Parliament All of these A State resolution None of these ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The time of closing the cycle, in modern circuit breakers is 0.1 sec. 0.01 sec. 0.003 sec. 0.001 sec. 0.1 sec. 0.01 sec. 0.003 sec. 0.001 sec. ANSWER DOWNLOAD EXAMIANS APP