Switch Gear In a single bus-bar system there will be complete shut down when fault occurs on the bus itself fault occurs with respect to earthing fault occurs on neutral line two or more faults occur simultaneously fault occurs on the bus itself fault occurs with respect to earthing fault occurs on neutral line two or more faults occur simultaneously ANSWER DOWNLOAD EXAMIANS APP
Switch Gear ________ relay is preferred for phase fault on short transmission line. Reactance Impedance None of these Induction type Reactance Impedance None of these Induction type ANSWER DOWNLOAD EXAMIANS APP
Switch Gear Series capacitors are used to None of these compensate for line inductive reactance improve line voltage compensate for line capacitive reactance None of these compensate for line inductive reactance improve line voltage compensate for line capacitive reactance ANSWER DOWNLOAD EXAMIANS APP
Switch Gear An overcurrent relay having current settling of 125% is connected to a supply circuit through a current transformer of 400/5 A. The pick-up current is 6.25 A 3.125 A 12.5 A 25 A 6.25 A 3.125 A 12.5 A 25 A ANSWER DOWNLOAD EXAMIANS APP
Switch Gear Most of the relays on service on electric power system are thermal relays None of these electro-mechanical relays electronic relays thermal relays None of these electro-mechanical relays electronic relays ANSWER DOWNLOAD EXAMIANS APP
Switch Gear The time of closing the cycle, in modern circuit breakers is 0.10 sec 0.01 sec 0.001 sec 0.003 sec 0.10 sec 0.01 sec 0.001 sec 0.003 sec ANSWER DOWNLOAD EXAMIANS APP