Process Control and Instrumentation In a shell and tube heat exchanger, the inlet temperature of heating/cooling fluid is the __________ variable. None of these Load Manipulated Controlled None of these Load Manipulated Controlled ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation The second order system with the transfer function 4/(S² + 2S + 4) has a damping ratio of 0.5 2.0 1.0 4.0 0.5 2.0 1.0 4.0 ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Pick out the one which is a first order instrument. Mercury in glass thermometer (without any covering or air gap) Bare vapor pressure thermometer Bare metallic thermometer All of these Mercury in glass thermometer (without any covering or air gap) Bare vapor pressure thermometer Bare metallic thermometer All of these ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Liquid flow rate in an open channel can not be measured by a/an V-notch Orifice meter Rectangular weir Cipolletti weir V-notch Orifice meter Rectangular weir Cipolletti weir ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation In a shell and tube heat exchanger, the flow rate of heating/cooling fluid is the __________ variable. Controlled Load Manipulated None of these Controlled Load Manipulated None of these ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation The offset introduced by proportional controller with gain Kc in response of first order system can be reduced by Reducing value of Kc Introducing derivative control None of these Introducing integral control Reducing value of Kc Introducing derivative control None of these Introducing integral control ANSWER DOWNLOAD EXAMIANS APP