Power Plant Engineering In a power station ' load center ' means Center of gravity of electrical system Center of maximum load of equipment Center of power plant Center of coal fields Center of gravity of electrical system Center of maximum load of equipment Center of power plant Center of coal fields ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering Fast breeder reactor uses Double circuit system of coolant cycle Direct cycle of coolant system Multi passes system Boiler Double circuit system of coolant cycle Direct cycle of coolant system Multi passes system Boiler ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering The energy released during the fission of one atom of Uranium 235 in million electron volts is about 100 400 300 200 100 400 300 200 ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering The control rods in the control system of nuclear reactors are used to Control temperature All of these Control fuel consumption Absorb excess neutrons Control temperature All of these Control fuel consumption Absorb excess neutrons ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering In order to have constant chain reaction to produce a constant rate of heat output, the value of ratio of the number of neutrons in one generation to the number of neutrons in the immediately preceding generation must be Less than 1.0 Equal to 1.0 Equal to zero Greater than 1.0 Less than 1.0 Equal to 1.0 Equal to zero Greater than 1.0 ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering The following present serious difficulty in designing reactor shield Beta particles Fast neutrons and gamma rays Thermal neutrons Alpha particles Beta particles Fast neutrons and gamma rays Thermal neutrons Alpha particles ANSWER DOWNLOAD EXAMIANS APP