System Analysis and Design
In a Decision tree

the root is drawn on the left and is the starting point on the decision sequence
the branch, to be followed, depends on the conditions and decisions, to be made
the nodes represent the conditions, with the right wise of tree listing the actions to be taken
all of the listed here

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
The term Parallel Run refers to

All of these
the same job run on two different computer to test their speeds
the concurrent operation of an existing system and a new system
the processing of two different jobs initiated from two terminals.
None of these

ANSWER DOWNLOAD EXAMIANS APP