GETCO Exam Paper (11-06-2017) If the reading of two wattmeters are equal and positive in two wattmeter method, the load power factor in abalanced 3-phase 3-wire circuit will be 0.866 0.5 unity zero 0.866 0.5 unity zero ANSWER EXPLANATION DOWNLOAD EXAMIANS APP W1 = W2 (+Ve) → PF = 1W1, W2 Positive → PF > 0.5W1 +Ve, W2 = 0 → PF = 0.5W1 +Ve, W2 = -Ve → PF < 0.5W1 = - W2 → PF = 0
GETCO Exam Paper (11-06-2017) Cells are connected in parallel in order to increase the life of the cells efficiency voltage rating current capacity life of the cells efficiency voltage rating current capacity ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The stability of arc in vacuum depends on the circuit parameters only the contact material with its vapour presssure and the circuit parameters the contact material and its vapour pressure the contact material only the circuit parameters only the contact material with its vapour presssure and the circuit parameters the contact material and its vapour pressure the contact material only ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Who called Subhashchandra Bose as Desh Nayak? Bal Gangadhar Tilak Rabinranath Tagore Lala Lajpat Rai Mahatma Gandhi Bal Gangadhar Tilak Rabinranath Tagore Lala Lajpat Rai Mahatma Gandhi ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) What is the India's rank in the 2017 Global Peace index as per global think tank institute for economics and peace (IEP)? 141st 133rd 155th 137th 141st 133rd 155th 137th ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Load shedding is done for reducing peak demand on the system power factor improvement efficient operation of equipment repairing of machines reducing peak demand on the system power factor improvement efficient operation of equipment repairing of machines ANSWER DOWNLOAD EXAMIANS APP