Economics of Power Generation If C is the capacitance per phase for delta connected capacitor bank, then capacitance per phase for star connected the capacitor bank is 3C C/√3 √3C C/3 3C C/√3 √3C C/3 ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. BHEL BEL SAIL NTPC BHEL BEL SAIL NTPC ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation ________ is invariably used for peak load Pumped storage plant Steam turbine plant Nuclear power plant None of these Pumped storage plant Steam turbine plant Nuclear power plant None of these ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Depreciation charge are high in case of Diesel plant Diesel plant Thermal plant Hydroelectric plant Diesel plant Diesel plant Thermal plant Hydroelectric plant ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation A consumer has to pay lesser fixed charges in two part tariff flat rate tariff any of the above maximum demand tariff two part tariff flat rate tariff any of the above maximum demand tariff ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The drawback of diminishing value method for calculating depreciation is that depreciation charges None of the listed here Are high in later years Are small in early years Are independent of rate of interest None of the listed here Are high in later years Are small in early years Are independent of rate of interest ANSWER DOWNLOAD EXAMIANS APP