Economics of Power Generation If C is the capacitance per phase for delta connected capacitor bank, then capacitance per phase for star connected the capacitor bank is √3C C/√3 C/3 3C √3C C/√3 C/3 3C ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation When the demand of consumer is not met by a power plant, it will resort to which of the following? Efficient plant operation Penalising high load consumers by increasing the charges for electricity Power factor improvement at the generators Load shedding Efficient plant operation Penalising high load consumers by increasing the charges for electricity Power factor improvement at the generators Load shedding ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The most economical power factor for a consumer is generally 1 0.95 lagging 0.6 lagging 0.75 lagging 1 0.95 lagging 0.6 lagging 0.75 lagging ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The connected load of a domestic consumer is around 5 kW 40 kW 120 kW 80 kW 5 kW 40 kW 120 kW 80 kW ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In two part tariff, variation in load factor will affect None of the listed here Both running and fixed charges Fixed charges Running charges None of the listed here Both running and fixed charges Fixed charges Running charges ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Depreciation charge are high in case of Diesel plant Thermal plant Diesel plant Hydroelectric plant Diesel plant Thermal plant Diesel plant Hydroelectric plant ANSWER DOWNLOAD EXAMIANS APP