Economics of Power Generation If C is the capacitance per phase for delta connected capacitor bank, then capacitance per phase for star connected the capacitor bank is C/3 C/√3 3C √3C C/3 C/√3 3C √3C ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The expected useful life of an hydroelectric power station is around 30 years 100 years 15 years 60 years 30 years 100 years 15 years 60 years ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation For any type of consumer the ideal tariif is Block rate tariff Two part tariff Three part tariff Any of the listed here Block rate tariff Two part tariff Three part tariff Any of the listed here ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Annual depreciation cost is calculated by Both sinking fund and straight line method Straight line method None of the listed here Sinking fund method Both sinking fund and straight line method Straight line method None of the listed here Sinking fund method ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In two part tariff, variation in load factor will affect Running charges None of the listed here Both running and fixed charges Fixed charges Running charges None of the listed here Both running and fixed charges Fixed charges ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Large capacity generators are invariably Hydrogen cooled Forced air cooled Water cooled Natural air cooled Hydrogen cooled Forced air cooled Water cooled Natural air cooled ANSWER DOWNLOAD EXAMIANS APP