Economics of Power Generation If C is the capacitance per phase for delta connected capacitor bank, then capacitance per phase for star connected the capacitor bank is √3C C/√3 3C C/3 √3C C/√3 3C C/3 ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Generators for peak load plants are usually designed for maximum efficiency at 25 to 50 % percent full load Full load 50 to 75 % percent full load 25 percent overload 25 to 50 % percent full load Full load 50 to 75 % percent full load 25 percent overload ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Salvage value of the plant is always Positive Any of the listed here Negative Zero Positive Any of the listed here Negative Zero ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation When the demand of consumer is not met by a power plant, it will resort to which of the following? Efficient plant operation Power factor improvement at the generators Penalising high load consumers by increasing the charges for electricity Load shedding Efficient plant operation Power factor improvement at the generators Penalising high load consumers by increasing the charges for electricity Load shedding ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation When the power factor of generating station is improved, the cost per unit Increases Decreases None of the listed here Remains same Increases Decreases None of the listed here Remains same ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The correct relation in the following is : kVAR = kW cos Ф kVAR = kW Sin Ф kVAR = kW tan Ф Not listed here kVAR = kW cos Ф kVAR = kW Sin Ф kVAR = kW tan Ф Not listed here ANSWER DOWNLOAD EXAMIANS APP