Automation System Historically, central systems were used because: semiconductor memory was not available All of these memory was very expensive memory consumed a large amount of power None of these semiconductor memory was not available All of these memory was very expensive memory consumed a large amount of power None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System The physical arrangement of equipment in a network is called: pairing topology logic queuing None of these pairing topology logic queuing None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System Speech recognition: is already widely used in industrial controls will never be used in industrial controls None of these will be used in more applications as the technology matures. All of these is already widely used in industrial controls will never be used in industrial controls None of these will be used in more applications as the technology matures. All of these ANSWER DOWNLOAD EXAMIANS APP
Automation System Which of the following method is used the results of a design analysis as a base for redesign decisions? The design selection method None of these The iterative design method All of these The direct method The design selection method None of these The iterative design method All of these The direct method ANSWER DOWNLOAD EXAMIANS APP
Automation System CAD/CAM is the inter-relationship between: engineering and manufacturing engineering and marketing marketing and design manufacturing and marketing None of these engineering and manufacturing engineering and marketing marketing and design manufacturing and marketing None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System Several objectives are required to achieve a successful data base management program. These are availability of data, quality of data, and desirability of data compatibility of data transmission of data up-to-date data None of these desirability of data compatibility of data transmission of data up-to-date data None of these ANSWER DOWNLOAD EXAMIANS APP