Economics of Power Generation For a large installation, it is better to apply Individual correction to small motors Bulk correction to large motors Individual correction to large motors None of the listed here Individual correction to small motors Bulk correction to large motors Individual correction to large motors None of the listed here ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Generators for peak load plants are usually designed for maximum efficiency at 25 percent overload 50 to 75 % percent full load Full load 25 to 50 % percent full load 25 percent overload 50 to 75 % percent full load Full load 25 to 50 % percent full load ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Load curve helps in deciding operating schedule of generating units all of the listed here sizes of the generating units total installed capacity of the plant operating schedule of generating units all of the listed here sizes of the generating units total installed capacity of the plant ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation ______ is the reserved generating capacity available for service under emergency conditions which is not kept in operation but but in working order. Cold reserve Hot reserve Spinning reserve Firm power Cold reserve Hot reserve Spinning reserve Firm power ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The area under load curve gives Energy consumed None of the listed here Average demand Maximum demand Energy consumed None of the listed here Average demand Maximum demand ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation For any type of consumer the ideal tariif is Block rate tariff Two part tariff Three part tariff Any of the listed here Block rate tariff Two part tariff Three part tariff Any of the listed here ANSWER DOWNLOAD EXAMIANS APP