DGVCL Exam Paper (12-06-2016) For a 66 kV line having span of 200 meters between towers the approximate sag will be 2 m. If the span is double the sag will be: 2 m 1 m 8 m 4 m 2 m 1 m 8 m 4 m ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) Admittance relay is _____ relay. Impedance Directional None of these Non-directional Impedance Directional None of these Non-directional ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) As per Electricity Act, _____ means any line which is used for carrying electricity for any purpose. Electric line None of these Transmission line All of these Electric line None of these Transmission line All of these ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The main disadvantages of having poor power factors are: All of these Poor voltage regulation High cost of station and distribution equipment High energy loss in conductor All of these Poor voltage regulation High cost of station and distribution equipment High energy loss in conductor ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) For cost & safety, the outdoor substations are installed for voltages above: 11 kV 33 kV 60 kV 110 kV 11 kV 33 kV 60 kV 110 kV ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The consumer of electricity could be: Domestic Industrial and Commercial All of these Agricultural Domestic Industrial and Commercial All of these Agricultural ANSWER DOWNLOAD EXAMIANS APP