Environmental Engineering in CE Deaeration of high pressure boiler feed water is done to reduce Its dissolved oxygen content Foaming from boilers Caustic embrittlement Its silica content Its dissolved oxygen content Foaming from boilers Caustic embrittlement Its silica content ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE When the concentration of SO₂ in air is greater than __________ ppm, it gives a pungent smell. 0.1 0.01 1 4 0.1 0.01 1 4 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE Color test of water is done with an instrument called Colorimeter Turbidimeter Electro-chemical cell Tintometer Colorimeter Turbidimeter Electro-chemical cell Tintometer ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE In a sedimentation tank, the detention period for water ranges from __________ hours. 24 to 32 2 to 4 16 to 20 8 to 12 24 to 32 2 to 4 16 to 20 8 to 12 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE Disinfection of water is done to destroy pathogenic bacteria and thus prevent water-borne diseases. Disinfection of water may be done by the use of Ozone and iodine All of these Ultraviolet light for irradiation of water Chlorine or its compounds Ozone and iodine All of these Ultraviolet light for irradiation of water Chlorine or its compounds ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering in CE Tri-sodium phosphate is used in boiler water treatment to reduce Caustic embrittlement Suspended silica Turbidity Dissolved oxygen Caustic embrittlement Suspended silica Turbidity Dissolved oxygen ANSWER DOWNLOAD EXAMIANS APP