Transmission & Distribution

Transmission & Distribution
Corona is likely to occur maximum in

All of the listed here
Transmission line
Domestic wiring
Distribution line

ANSWER DOWNLOAD EXAMIANS APP

Transmission & Distribution
A 3 wire dc distribution system makes available

Two voltages
None of the listed here
One voltages
Three voltages

ANSWER DOWNLOAD EXAMIANS APP

Transmission & Distribution
If the height of transmission tower is increased, which of the following parameters is likely to change?

All of the listed here
Resistance
Inductance
Capacitance

ANSWER DOWNLOAD EXAMIANS APP

Transmission & Distribution
The usual span with RCC Poles are

40-50 meters
800-100 meters
300-500 meters
60-100 meters

ANSWER DOWNLOAD EXAMIANS APP

Transmission & Distribution
The underground system cannot be operated above

33 V
440 V
66 V
11 V

ANSWER DOWNLOAD EXAMIANS APP

Transmission & Distribution
In a D.C. 3-wire distribution system, balancer fields are cross-connected in order to

boost the generated voltage
equalize voltages on the positive and negative outers
make both machine^ run as unloaded motors
balance loads on both sides of the neutral

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Transmission & Distribution

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑