Chemical Engineering Plant Economics Construction expenses are roughly __________ percent of the total direct cost of the plant. 2 50 30 10 2 50 30 10 ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics For a given fluid, as the pipe diameter increases, the pumping cost Remains the same Decreases May increase or decrease, depending upon whether the fluid is Newtonian or non-Newtonian Increases Remains the same Decreases May increase or decrease, depending upon whether the fluid is Newtonian or non-Newtonian Increases ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics In which of the electric power generation system, the operating cost is minimum? Hydroelectric Thermal Nuclear Fast breeder reactor Hydroelectric Thermal Nuclear Fast breeder reactor ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Optimum number of effects in a multiple effect evaporator is decided by the Floor area availability Evaporation capacity required Terminal parameters Cost benefit analysis Floor area availability Evaporation capacity required Terminal parameters Cost benefit analysis ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Which of the following is not a mathematical method for evaluation of profitability of a chemical process plant? Discounted cash flow based on full life performance Rate of return on investment Cash reserve Payout period Discounted cash flow based on full life performance Rate of return on investment Cash reserve Payout period ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Accumulated sum at the end of 5 years, if Rs. 10000 is invested now at 10% interest per annum on a compound basis is Rs. 12500 16105 18105 15000 12500 16105 18105 15000 ANSWER DOWNLOAD EXAMIANS APP