Design of Masonry Structures Consider the following statements:A high lime content in a composite cement-lime mortar results in1. Slow hardening.2. Quick setting.3. Weaker mortar. 1 and 2 are correct 1 and 3 are correct 1, 2 and 3 are correct 2 and 3 are correct 1 and 2 are correct 1 and 3 are correct 1, 2 and 3 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Design of Masonry Structures Consider the following statements:1. Masonry in rich cement mortar though having good strength with high shrinkage is much liable for surface cracks.2. Lime mortar possesses poor workability and poor water retentivity and also suffers high shrinkage.3. Masonry in lime mortar has better resistance against rain penetration and is less liable to crack when compared to masonry in cement mortar.Which of these statements are correct? 1 and 3 1, 2 and 3 1 and 2 2 and 3 1 and 3 1, 2 and 3 1 and 2 2 and 3 ANSWER DOWNLOAD EXAMIANS APP
Design of Masonry Structures Consider the following statements regarding provision of chases in masonry,(i) No chase should be permitted in a half brick load-bearing wall,(ii) Vertical chases should not be closer than 2 m in any stretch of a wall,(iii) Chases should be provided near to bearings of beams and lintels. (ii) and (iii) are correct (i), (ii) and (iii) are correct (i) and (ii) are correct (i) and (iii) are correct (ii) and (iii) are correct (i), (ii) and (iii) are correct (i) and (ii) are correct (i) and (iii) are correct ANSWER DOWNLOAD EXAMIANS APP
Design of Masonry Structures Full restraint is provided by(i) Foundation footing of a wall(ii) Timber floor spanning on the wall and anchored to the wall(iii) RCC slab with a minimum bearing of 10 cm on the wall (i) and (ii) are correct (ii) and (iii) are correct (i), (ii) and (iii) are correct (i) and (iii) are correct (i) and (ii) are correct (ii) and (iii) are correct (i), (ii) and (iii) are correct (i) and (iii) are correct ANSWER DOWNLOAD EXAMIANS APP
Design of Masonry Structures For strengthening a 50 m long and 5 m high straight compound wall built in brick work, which one of the following would be most suitable? Using stronger bricks Using a richer mortar Providing a deeper foundation Providing buttresses at certain intervals Using stronger bricks Using a richer mortar Providing a deeper foundation Providing buttresses at certain intervals ANSWER DOWNLOAD EXAMIANS APP
Design of Masonry Structures For earthquake resistant masonry buildings, the vertical distance between openings one above the other in a load bearing wall shall not be less than 100 cm 50 cm 75 cm 60 cm 100 cm 50 cm 75 cm 60 cm ANSWER DOWNLOAD EXAMIANS APP