Consider the following statements regarding bands to be provided for strengthening masonry work in masonry buildings constructed in zone III, IV and V. (i) Lintel band is provided at lintel level on partition walls, (ii) Gable band is provided at top of gable masonry below the purlins, (iii) The bands shall be to full width of the wall and not less than 7.5 cm in depth, (iv) The bands shall be made of reinforced concrete only.of these statements, the correct statements are

(ii) and (iii)
(ii) and (iv)
(i) and (iii)
(i) and (ii)

ANSWER DOWNLOAD EXAMIANS APP

Design of Masonry Structures
Consider the following statements:
1. Masonry in rich cement mortar though having good strength with high shrinkage is much liable for surface cracks.
2. Lime mortar possesses poor workability and poor water retentivity and also suffers high shrinkage.
3. Masonry in lime mortar has better resistance against rain penetration and is less liable to crack when compared to masonry in cement mortar.
Which of these statements are correct?

1 and 2
2 and 3
1, 2 and 3
1 and 3

ANSWER DOWNLOAD EXAMIANS APP

Design of Masonry Structures
Assertion A : Lime based mortars give higher ratio of brickwork strength to mortar strength as compared to non-lime mortar.Reason R : Lime based mortars have lower bond strength as compared to non-lime mortars.Select your answer according to the codes given below:

Both A and R is true but R is not the correct explanation of A
A is true but R is false
A is false but R is true
Both A and R is true and R is the correct explanation of A