Environmental Engineering As compared to higher pH values, the contact period required for efficient chlorination at lower pH values is Larger None of these Smaller Same Larger None of these Smaller Same ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering A pipe conveying sewage from plumbing system of a single building to common sewer or point of immediate disposal is called House sewer Lateral sewer Sub-main sewer Main sewer House sewer Lateral sewer Sub-main sewer Main sewer ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Turbidity is measured on Platinum cobalt scale Standard cobalt scale Standard platinum scale Standard silica scale Platinum cobalt scale Standard cobalt scale Standard platinum scale Standard silica scale ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Chlorine demand of water is equal to Residual chlorine Sum of applied and residual chlorine Difference of applied and residual chlorine Applied chlorine Residual chlorine Sum of applied and residual chlorine Difference of applied and residual chlorine Applied chlorine ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Septic tank is a (i) Settling tank (ii) Digestion tank (iii) Aeration tank Only (i) (i) and (ii) (i) and (iii) Only (iii) Only (i) (i) and (ii) (i) and (iii) Only (iii) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The per capital consumption of a locality is affected by (i) Climatic conditions (ii) Quality of water (iii) Distribution pressure All (i), (ii) and (iii) Both (i) and (iii) Both (i) and (ii) Only (i) All (i), (ii) and (iii) Both (i) and (iii) Both (i) and (ii) Only (i) ANSWER DOWNLOAD EXAMIANS APP