Engineering Drawing An accurate record of changes made to release drawings is tracked via this: Portable documents The basic title form Working drawings A revision block Portable documents The basic title form Working drawings A revision block ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________. Modification slip None of these Change order Whole new set of drawings Modification slip None of these Change order Whole new set of drawings ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing When creating an isometric drawing in Auto-CAD the drafter can utilize the Dynamic Input and Polar Coordinate system to place both vertical and horizontal lines. A line created from one point 3 inches at 180 degrees would be a ________ line. Horizontal None of these Inclined Vertical Horizontal None of these Inclined Vertical ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing The primary unit of measurement for engineering drawings and design in the mechanical industries is the: Centimeter Kilometer Meter Millimeter Centimeter Kilometer Meter Millimeter ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Auto-CAD refers to isometric ellipses as ________. Circles Iso-circles Ellipses Iso-ellipses Circles Iso-circles Ellipses Iso-ellipses ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing This should show what changes were made, when, and by whom: Title form Portable document Revision drawings Record of revisions Title form Portable document Revision drawings Record of revisions ANSWER DOWNLOAD EXAMIANS APP