Management Information Systems All mathematical models generally comprise which of the following types of variables; None of these dependent variables uncontrollable variables decision variables All of these None of these dependent variables uncontrollable variables decision variables All of these ANSWER DOWNLOAD EXAMIANS APP
Management Information Systems Computer-based traffic control systems are implemented at the _____ level of government. Local None of these bottom Top Top-to-bottom Local None of these bottom Top Top-to-bottom ANSWER DOWNLOAD EXAMIANS APP
Management Information Systems Functional information subsystems can be classified into input and output subsystems input and processing subsystems processing and output subsystems None of these input, processing, and output subsystems input and output subsystems input and processing subsystems processing and output subsystems None of these input, processing, and output subsystems ANSWER DOWNLOAD EXAMIANS APP
Management Information Systems Critical path of the PERT chart is: path which takes the shortest time to complete the project None of these both of the above the shortest path path which takes the longest time to complete the project path which takes the shortest time to complete the project None of these both of the above the shortest path path which takes the longest time to complete the project ANSWER DOWNLOAD EXAMIANS APP
Management Information Systems _____ is the ratio of correct information to the total amount of information produced over a period. concise None of these decision simulation accuracy concise None of these decision simulation accuracy ANSWER DOWNLOAD EXAMIANS APP
Management Information Systems PCM stands for _____ plug-compatible manufacturer personal computer media None of these PC-modem PC-manufacturer plug-compatible manufacturer personal computer media None of these PC-modem PC-manufacturer ANSWER DOWNLOAD EXAMIANS APP