Measurement and Instrumentation
A variable w is related to three other variables x, y and z as w = xy/z. The variables are measured with meters of accuracy ± 0.5% reading, ± 1% of full scale value and ± 1.5% reading. The actual readings of the three meters are 80, 20 and 50 with 100 being the full scale value for all three. The maximum uncertainty in the measurement of w will be

 ± 7%
 ± 6%
 ± 8%
 ± 5%

ANSWER DOWNLOAD EXAMIANS APP

Measurement and Instrumentation
Why is a MISC meter not recommended for DC measurement?

The error is high due to hysteresis effect
The meter does not respond to DC signals
The error is high due to eddy current effect
The meter is calibrated for AC and it’s error for DC would be high

ANSWER DOWNLOAD EXAMIANS APP