Environmental Engineering A pipe which is installed in the house drainage to preserve the water seal of traps is called Vent pipe Anti-siphonage pipe Waste pipe Soil pipe Vent pipe Anti-siphonage pipe Waste pipe Soil pipe ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering For satisfactory working of a sludge digestion unit, the pH range of digested sludge should be maintained as 8.5 to 10.0 6.5 to 8.0 10.5 to 12.0 4.5 to 6.0 8.5 to 10.0 6.5 to 8.0 10.5 to 12.0 4.5 to 6.0 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The ratio of 5 day BOD to ultimate BOD is about 43894 43833 1 43864 43894 43833 1 43864 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Cleaning is done by (i) Scraping and removal in filters slow sand (ii) Back washing in slow sand filters (iii) Scraping and removal in filters rapid sand (iv) Back washing in rapid sand filters The correct answer is (ii) and (iv) (i) and (ii) (ii) and (iii) (i) and (iv) (ii) and (iv) (i) and (ii) (ii) and (iii) (i) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering In facultative stabilization pond, the sewage is treated by Sedimentation Algae only Dual action of aerobic bacteria and anaerobic bacteria Aerobic bacteria only Sedimentation Algae only Dual action of aerobic bacteria and anaerobic bacteria Aerobic bacteria only ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The maximum efficiency of BOD removal is achieved in Oxidation pond Oxidation ditch Trickling filters Aerated lagoons Oxidation pond Oxidation ditch Trickling filters Aerated lagoons ANSWER DOWNLOAD EXAMIANS APP