Mechanical Operations A. __________ mill is a revolving mill divided into two or more sections by perforated partitions in which preliminary grinding takes place at one end and the finishing grinding at the discharge end. Rod Pebble Compartment Tube Rod Pebble Compartment Tube ANSWER DOWNLOAD EXAMIANS APP
Mechanical Operations Gravity settling process is not involved in the working of a Dorr-thickener Hydrocyclone Sedimentation tank Classifier Dorr-thickener Hydrocyclone Sedimentation tank Classifier ANSWER DOWNLOAD EXAMIANS APP
Mechanical Operations The energy required per unit mass to grind limestone particles of very large size to 100 μm is 12.7 kWh/ton. An estimate (using Bond's law) of the energy to grind the particles from a very large size to 50 μrn is 25.4 kWh/ton 6.35 kWh/ton 18 kWh/ton 9.0 kWh/ton 25.4 kWh/ton 6.35 kWh/ton 18 kWh/ton 9.0 kWh/ton ANSWER DOWNLOAD EXAMIANS APP
Mechanical Operations The filtrate flow rate in constant pressure filtration Remains constant throughout Continuously decreases May increase or decrease ; depends on the pressure Continuously increases Remains constant throughout Continuously decreases May increase or decrease ; depends on the pressure Continuously increases ANSWER DOWNLOAD EXAMIANS APP
Mechanical Operations A pebble mill Both B and C Is a ball mill Is a tube mill lined with ceramic or other non-metallic liner Employs flints or ceramic pebbles as the grinding medium Both B and C Is a ball mill Is a tube mill lined with ceramic or other non-metallic liner Employs flints or ceramic pebbles as the grinding medium ANSWER DOWNLOAD EXAMIANS APP
Mechanical Operations Dry powdery solid materials are transported by a __________ conveyor. Belt Bucket Screw None of these Belt Bucket Screw None of these ANSWER DOWNLOAD EXAMIANS APP