Transmission & Distribution 220 kV transmission line voltage is economical for a distance of 400 km 200 km 100 km 22 km 400 km 200 km 100 km 22 km ANSWER DOWNLOAD EXAMIANS APP
Transmission & Distribution The cause of damage to the lead sheath of a cable is chemical action on the lead when buried in the earth mechanical damage crystallisation of the lead through vibration all of these chemical action on the lead when buried in the earth mechanical damage crystallisation of the lead through vibration all of these ANSWER DOWNLOAD EXAMIANS APP
Transmission & Distribution Corona result in Power factor improvement None of the listed here Radio frequency Better regulation Power factor improvement None of the listed here Radio frequency Better regulation ANSWER DOWNLOAD EXAMIANS APP
Transmission & Distribution A booster is connected in _____ with the feeder. Parallel None of the listed here Series-parallel Series Parallel None of the listed here Series-parallel Series ANSWER DOWNLOAD EXAMIANS APP
Transmission & Distribution The distribution transformer is generally connected in Star/star Delta/Star Star/Delta Delta/Delta Star/star Delta/Star Star/Delta Delta/Delta ANSWER DOWNLOAD EXAMIANS APP
Transmission & Distribution In the event of the fault, line can be opened quickly by Fuse CB All of the listed here G. O. Switch Fuse CB All of the listed here G. O. Switch ANSWER DOWNLOAD EXAMIANS APP